Slow, but steady progress. The low voltage conduit contractors installed the in-home vacuum piping, recepticles, and wiring this week. I also coordinated with them on the side to run conduit (the orange tubing) for future CAT6 connectivity. I’m really excited to get the CAT6 run and punched down to the patch panel in the basement.
We have been playing guessing games as to what is coming next. Hoping we get the hardboard siding and exterior stone accents delivered soon. At some point in the near future, we know there will also be a pre-drywall inspection (most likely before they do the spray foam insulation). After doing some research, we decided it would be wise to have a home inspector assist us in this step, just to make sure we have a neutral and experienced third party look things over on our behalf.