Yesterday cabinets were delivered, and by the end of the day today, the kitchen and bathroom installation was complete. Next step is coordinating with East Coast Granite to template and install the marble countertops.
We are down to the last two months of the build process and we are starting to get really excited about the big move. On Tuesday, we’ll be meeting with our construction supervisor to discuss the placement of our driveway and hopefully by that time, or soon thereafter, we’ll have better projected completion dates for the remaining work:
- Kitchen, bathroom countertop template, installation
- Appliance delivery, installation
- Deck, sun room
- Stone accents in front of house, around fireplace, install fireplace cap
- Garage door, mailbox installation
- Gutters, downspouts, extend drainage pipes around basement of house
- Poured concrete for the driveway, patio, parking pad, sidewalk to front entryway
- Hardwood flooring, carpet installation
- Final Plumbing hookup, toilets, sinks
- Final Electrical hookup, light switches, electrical box covers, power on HVAC
- Lighting, fan installation
- Internal paint and trim touch up, clean up
- Septic tank installation
- Final grading, landscaping, irrigation installation
- Power wash exterior, second coat of paint
Punch list items:
- Replace spray foam over sprayed roof shingles
- Repair damaged brickwork
- Replace damaged window trim
- Replace damaged island trim
The exterior paint color was a great mistake by the workers… it’s stunning with the pop of white trim😀🤭❤️
I love the white cabinets? What color flooring did you decide on in the kitchen?
We chose a dark hand-scarped hardwood. Can’t wait to see them installed!