Cabinet Installation

Yesterday cabinets were delivered, and by the end of the day today, the kitchen and bathroom installation was complete. Next step is coordinating with East Coast Granite to template and install the marble countertops.

Cabinets have been delivered
All these boxes have it feeling like Christmas in February
Cabinet hardware
We went with the brushed nickel look
Kitchen cabinets are beginning to be placed
By lunch time, the bathroom vanities were in – Here’s a peak at the guest bath
Master en suite cabinets and hardware look great
Second level jack n jill bathroom
Single vanity installed on one side
Second level jack n jill bath
Larger, second vanity installed on the other
After work we visited the site again and the cabinet installation was complete
The next step will be to create a template for the stone countertops
Can’t wait to see the marble countertops and black stainless appliances go in
The center island has storage on one side plus accommodate seating for two
Lots of natural light with the sliding glass doors and windows above the sink
Love the placement of the dishwasher and corner sink
Can’t wait to see the wall oven and cook top stove with vent fan go in

We are down to the last two months of the build process and we are starting to get really excited about the big move. On Tuesday, we’ll be meeting with our construction supervisor to discuss the placement of our driveway and hopefully by that time, or soon thereafter, we’ll have better projected completion dates for the remaining work:

  • Kitchen, bathroom countertop template, installation
  • Appliance delivery, installation
  • Deck, sun room
  • Stone accents in front of house, around fireplace, install fireplace cap
  • Garage door, mailbox installation
  • Gutters, downspouts, extend drainage pipes around basement of house
  • Poured concrete for the driveway, patio, parking pad, sidewalk to front entryway
  • Hardwood flooring, carpet installation
  • Final Plumbing hookup, toilets, sinks
  • Final Electrical hookup, light switches, electrical box covers, power on HVAC
  • Lighting, fan installation
  • Internal paint and trim touch up, clean up
  • Septic tank installation
  • Final grading, landscaping, irrigation installation
  • Power wash exterior, second coat of paint

Punch list items:

  • Replace spray foam over sprayed roof shingles
  • Repair damaged brickwork
  • Replace damaged window trim
  • Replace damaged island trim

2 Replies to “Cabinet Installation”

  1. The exterior paint color was a great mistake by the workers… it’s stunning with the pop of white trim😀🤭❤️

    I love the white cabinets? What color flooring did you decide on in the kitchen?

Leave a Reply to Derek Cancel reply

Your email address will not be published. Required fields are marked *