Drywall Taping & Mudding

The drywall portion of the build process is just about complete! The taping and mudding is well underway, with only a few touch ups and possibly a second coat needed in a handful areas before sanding and painting can begin.

Meanwhile, workers have already begun to put up the external hardy board siding and trim. We are hoping to have some of those pictures ready to share with everyone by the end of this week.

For now, here are some more shots of the drywall progress to date.

Looking into the dining room from the front entry
Hall leading to the master bedroom, office / guest bedroom, and guest bath
Looking into the master bedroom from the doorway
Standing in the walk-in closet and looking through the master en suite
Front office / guest bedroom
Front entry
Dining room
Great room
Kitchen and second floor loft
Kitchen
Bonus room / fifth bedroom
Upper level, front facing bedroom
Upper level, rear facing bedroom
Great room view from the second story loft
Garage
Walk-out basement

Leave a Reply

Your email address will not be published. Required fields are marked *