Framing – Day Fourteen

We were excited when we arrived at the site and the framing crew was packing up and heading out. After 14 work days, framing has been completed! All the braces were taken down and floors were “cleaned”. We could finally get a good feel for the finished space and layout.

Garage
Garage
Walking in from the garage
Breakfast nook and kitchen
Looking through pantry and laundry room into the garage
Looking from kitchen into the great room
Looking from the great room into the dining room and out the front entry
Zero-Clearance wood burning fireplace has been framed
Dining room looking into the great room
Front entry looking into dining room, great room, and kitchen
Front office/guest bedroom
Front office closet looking through master suite
Master bedroom
Master suite
Bonus room/fifth bedroom
Second story front bedroom
Second story rear bedroom
Upstairs loft looking down into the great room