We received a call this morning giving us a heads up that we needed to bring our induction cook top to the construction site for the marble countertop installation. When we arrived, we found that some finishing trim work was being completed too.
By the end of the day, when we stopped back to pick up the cook top, the kitchen countertops and island were done. And, we had some closet shelving, bathroom mirrors, and doorknobs too.
All in all, while the plumber and HVAC contractors haven’t made an appearance yet, it was a nice surprise to have this other work completed a day early. Here are some pictures of today’s progress:
Bathroom mirrors and closet shelving deliveryShelving is laid out while closets are being prepped for installationKitchen pantry shelving is completeLaundry room shelving – We’ll probably have cabinets installed in the futureGuest bathroom linen closet – We may alter this at a later time in order to utilize it as a coat closet insteadDerek checking out the master en suite mirror that was installed – it’s HUGE!Another view of the master en suite mirrorThe master bedroom walk-in closet will definitely need an organizer – We might need to take a trip to IKEA and look around at their customizable optionsShelving in the guest bedroom (Derek’s office) is completeLinen closet in the jack n jill bathThe mirror has been installed above one of the vanities in the jack n jill bath and the towel wracks will be going up nextShelving in the rear facing, second level bedroomShelving in the front facing, second level bedroomMirror and towel holder installed at the other end of the jack n jill bathroomShelving in the front facing, bonus room/fifth bedroomWhile checking out the finishing trim work being completed, the countertop installation crew arrived, so we decided to stick around and grab some progress pictures.This section that’s being carried in is for the corner kitchen sinkThis section will soon have a cook top cut out from the center of itThis section was from the replacement slab that I wasn’t too sure about, but now that it’s in place, I’m loving it!Prepping to install the kitchen sinkKitchen Island has been installed – It’s looks like a piece of artLove the finished look – Can’t wait to see the vent fan and wall oven go inThe cook top is in, but the drawer underneath it will need some modification to make it usableTomorrow, the marble will be sealed in order to prevent future staining – The sealer we selected comes with a 25yr warrantyWhen we returned at the end of the day to pick up the cook top, we found that the lighting and fans had been delivered! We hope to see those installed by the end of this week.