Not too much happening this week, we’ve been stalking the build progress daily. Today we noticed that the water tap has been moved and both meters are installed. Also, the pedestal box has been put back together and the ground around it backfilled.

Other news is vapor barrier has been put down in preparation for the concrete to get poured. We are super excited to see the basement and garage concrete slabs get poured as it feels like a milestone in the process. Finally, there is a pile of floor trusses laying off to the side as a hint of how close we are to the framing process starting.