There has been a lot of work completed at the house this week. The wood stair treads leading up to the second story and guard rails have been installed and are waiting to be stained. The deck portion of the sun room has also been completed. The next step is to have the screened walls and stairs put in. Also, the frameless glass shower door in the master en suite has been installed, and all the bathroom vanity countertops have replaced.
Here are the items still left to complete:
- Interior clean up, paint and trim touch up, – Scheduled for this coming week
- Carpet installation – TBD
- Appliance delivery, installation – TBD
- Sun room screens and deck stairs – TBD
- Gutters, downspouts, extend drainage pipes around basement of house – TBD
- Stone accents in front of house, around fireplace, install chimney cap – TBD
- Final grading, landscaping, irrigation installation – TBD
- Power wash exterior, second coat of paint – TBD
Punch list items:
- Replace spray foam over sprayed roof shingles
- Repair damaged brickwork
- Replace damaged window trim
Everything looks SO GOOD!!! πππ»ππ»ππ»ππ»π€ππππ
That kitchen tho…. spectacular home, Congratulations!!!! ππΎππ
π€πππ